Simmons Church Remodel

We prepared the stage area for the new organ by removing walls and relocating other items. We uninstalled the cross, modified it to make it smaller, then reinstalled it after the organ was installed.

Simmons (1)

Simmons (17)

Simmons (57)

We installed brackets along the back wall, and reinforced them to accommodate the weight of the organ pipes.

 

Simmons (74)

Simmons (81)

Simmons (92)

Simmons (104)

We designed and installed a wheelchair ramp to make the stage and sanctuary handicap-accessible.

 

Simmons (112)

We enlarged the conference room and library by removing three walls. We also installed carpet and painted.

 

Simmons (118)

Simmons (121)